CEPS a.s. — Solutions that fit
home / services / about us / case studies / communications / contact / facebook
english / по-русски / česky / polski

Communications

We regularly publish and lecture on topics in the field of steel high-pressure pipelines. Read some of our communications.

You can find details of the selected products, services and related topics. You can learn e.g. how we replaced 32 pipes on Druzhba oil pipeline in less than 88 hours.

In the case studies section you can see details of some of our jobs.

articles

CEPS again in the Baltics

PETROL Magazín 1 / 2023

The Effect of heavy-duty vehicle crossings on the state of stress of buried pipelines

Metals 1 / 2022

Offline internal inspection in the Czech Republic

World Pipelines 4 / 2018

Comprehensive approach to the decommissioning of oil pipelines

Pipeline Technology Journal 4 / 2017

A new approach to the results of internal inspection

Pipeline Technology Journal 6 / 2015

Systematic approach streamlines natgas pipeline pressure increase

OIL&GAS Journal 11 / 2013

Replacing 32 pipes on the Druzhba oil pipeline in under 88 hours

PIPELINES International 3 / 2011


papers

Comprehensive approach to the decommissioning of oil pipelines

Pipeline Pigging Conference
Tehran, Iran, 2016

Measuring hydraulic parameters of gas pipelines in operation

13th International SIMONE Congress
Krakow, Poland, 2016

New approach to the results of internal inspection

10th Pipeline Technology Conference
Berlin, Germany, 2015

Comprehensive approach to ensuring the integrity of high-pressure gas pipeline DN 400

8th Pipeline Technology Conference
Hannover, Germany, 2013

Big oil removal and great pipeline cleaning

Repair and Rehabilitation of Pipelines Conference
Prague, Czech Republic, 2011

Exchange of 32 pipes of crude oil pipeline DN 500 Druzhba during 96 hours

Repair and Rehabilitation of Pipelines Conference
Berlin, Germany, 2010


articles in Czech

Sleeves and their ‘hard reality’: Composite versus steel on steel pipes CZ

Plyn 3 / 2021

Effect of heavy-duty vehicles riding over buried pipes on stress in the pipes CZ

Plyn 2 / 2020

Preventing the formation of flammable hydrocarbon mixtures through inerting CZ

Plyn 4 / 2017

Off-line inspection: An important tool for investment decisions CZ

Plyn 2 / 2017

Research into gas pipeline vacuum drying CZ

Plyn 2 / 2017

The First off-line inspection of a distribution high-pressure gas pipeline in the Czech Republic CZ

Plyn 6 / 2016

Measuring methane explosibility under higher pressures CZ

Plyn 11–12 / 2015

Influence of the properties of the heat affected zones of longitudinal welds on gas pipeline integrity CZ

Plyn 1 / 2015

Lithuania wins independence of Russian natural gas supplies, and we were there! CZ

Plyn 12 / 2014

Safer purging of pipelines carrying flammable gases and liquids CZ

Plyn 3 / 2014

PETROL Magazín 4 / 2014

Slovgas 4 / 2014

Tackling technical difficulties in hydraulic tests on large-diameter gas pipelines CZ

Plyn 4 / 2013

Explosive limits for purging pipelines carrying flammable substances using gas mixtures CZ

Plyn 3 / 2014

Development of plastic deformations in steel under constant load and their importance for practice in the gas industry CZ

Plyn 9 / 2013

Alternative drive for inspection pigs CZ

Plyn 2 / 2013

Slovgas 2 / 2013

A comprehensive approach to integrity of a DN 400 high-pressure pipeline CZ

Plyn 5 / 2011

Assessing the technical condition of high-pressure gas pipelines using the pressure-induced repair method SK

Slovgas 2 / 2009 + 4 / 2009

Plyn 9 / 2009 + 10 / 2009

Permanent repairs of steel pipes in operation with the help of sleeves and wraps CZ

Plyn 11 / 2006


© 2013–2025 CEPS a.s. / Technical specifications CZ / Contacts