communications


Authors of the presentation

Petr Crha, CEPS

Aleš Brynych, CEPS

Conference information

Repair and Rehabilitation of Pipelines Conference, Berlin, Germany, 2010

Go to the related items

  • Services
  • Case studies
  • About us
  • Communications
  • Contacts

Downloads

  • Exchange of 32 pipes of crude oil pipeline DN 500 Druzhba during 96 hours conference presentation in PDF (15992 kB)

Exchange of 32 pipes of crude oil pipeline DN 500 Druzhba during 96 hours

Special repair works were carried out in crude oil pipeline Druzhba between pump station Klobouky and village Tesany in southern Moravia region in Czech Republic in September 2007. These works were unique by own range, limited performance time period and number of used workers and equipments.

32 randomly dislocated pipes were replaced by new pipes onto 9.7 km long section of crude pipeline during all of 96 hours.

In the beginning of this work the section of pipeline was full of crude oil (approximately 2,000 m³) under hydrostatic pressure. To be able to fulfil request and needs of the operator major supplier CEPS had to choose unique and so far never used technology in crude oil pipeline. Crude oil was forced out from the whole section and then perfect decontamination of whole section was performed. This technology enabled to work on the pipeline with open flame, i.e. to use autogenic cutter and carried out next welding works without special environmental and fire protection.

The application of new technology enabled to perform exchange of high number of pipes in very short time, which traditional technologies (for example to plug the line using TDW STOPPLE or exhausting of crude oil) don’t allow in this limited time. Relatively low price is another advantage of this new technology.

See the presentation Exchange of 32 pipes of crude oil pipeline DN 500 Druzhba during 96 hours (PDF, 15992 kB), that our representatives presented at the Repair of Pipelines Conference, in the 2010, in Berlin, Germany.

For more information, see the related project, Exchange of 32 pipes on DN 500 crude oil pipeline within 88 hours – was that a world record?, and article, Replacing 32 pipes on the Druzhba oil pipeline in under 88 hours.

related services

The topic of this presentation is related to the following services of the company CEPS

  • All services

Pigging services – mechanical and chemical cleaning

services


related case studies

See related CEPS case studies

  • All case studies

Exchange of 32 pipes on DN 500 crude oil pipeline within 88 hours

Klobouky–Ořechov, Czech Republic
2007

case studies


related documents

For more documents and other information, see the section about us

  • All about CEPS

Technical specifications CZ

about CEPS


related communications

Examine more in articles related to this topic

  • All articles

Replacing 32 pipes on the Druzhba oil pipeline in under 88 hours

PIPELINES International 3 / 2011

communications


contact

If you have any questions, do not hesitate to contact CEPS responsible persons

  • Contact us

Aleš Brynych

general manager – CEO

phone +420 241 021 547

info@ceps-as.cz

Filip Tesař

sales manager

phone +420 606 641 328

info@ceps-as.cz

CEPS a.s. Head office

phone +420 241 021 511
fax +420 241 021 512

e-mail info@ceps-as.cz

see all contacts and maps


© 2013–2025 CEPS a.s. / Technical specifications CZ / Contacts