CEPS a.s. — Solutions that fit
home / services / about us / case studies / communications / contact / facebook
english / по-русски / česky / polski

services


On this page

  • Our equipment
  • Main references

Go to the related items

  • Services
  • Case studies
  • About us
  • Communications
  • Contacts

Revalidation, upgrading and rehabilitation of pipelines

CEPS expertise enables us to provide a complete package of services enabling our customers to significantly extend the period of safe and reliable operation of their high pressure steel pipelines, to improve and verify the actual level of safety and reliability, to re-confirm the integrity and design factor after a long period of pipeline operation or even to increase the maximum allowed operation pressure in order to increase the transport capacity.

 

 

 

 

 

PreviousNext

Hydrostatic retesting of existing pipelines allows revalidation and upgrading and verifying the pipeline strength needed for its future safe and reliable operation at the specified MAOP.

CEPS provides

  • Mechanical and metallographic testing of steel samples taken from the pipeline
  • Hydrostatic testing, cyclic pressure load tests, burst tests on test vessels manufactured from pipe spools taken from the pipeline to verify that target operating pressure level complies with the required MAOP and to simulate a desired future pipeline lifetime
  • Safe and reliable implementation of the testing program on the pipeline
  • Engineering studies based on the existing pipeline data, the pipeline material examination and experimental work on test vessels
  • Pipeline upgrading project management to increase the MAOP above its originally specified level
  • Pipeline rehabilitation project management

During hydrostatic tests of many old pipelines, it is possible to achieve test pressures loading the pipeline steel to the level of yield stress without consuming the elasticity of the steel.

Such a tests accurately determine the actual pipeline state

  • critical defects burst and are repaired,
  • subcritical fatigue cracks are blocked (CRACK BLUNTING),
  • stress concentrators removed, and
  • areas with reduced WT like general corrosion spots are re-shaped that results in better resistance to fatigue process.

The achieved cost saving on such projects is enormous.


our equipment

Pressure heads 4″ to 48″, 150–250 bar
High-pressure pumps max 2× 220 l/min, max 250 bar
max 2× 230 l/min, max 230 bar
max 100 l/min, max 180 bar
max 6 l/min, max 450 bar
max 3 l/min, max 700 bar
Filling pumps max 2× 350 m³/hour, max 60 bar
max 2× 250 m³/hour, max 30 bar
Filling / Feeding pump max 7× 110 m³/hour, max 14 bar
Mobile tanks 10–30 m³
Control and measurement rooms mobile on truck
Computerized control units ✓
Pressure transmitters 600 bar, accuracy 0.05%
270 bar, accuracy 0.1%
Flow meters up to 470 l/min, accuracy 0.5%
Thermometer −30 °C to +60 °C, accuracy 0.05 °C

Compressors

2000 m³/h, 20 bar
2× 1800 m³/h, 20 bar
2× 1500 m³/h, 12 bar
2× 650 m³/h, 12 bar
Boosters 2× 900 m³/h, 25 bar (inlet 10 bar)

main references

Among others we have successfully completed these reference projects in last years

Revalidation of more than 1000 km of old 4″ to 28″ natural gas pipelines with the MAOP increasing from 16 bar to 40 bar or from 25 bar to 40 bar in Czech Republic
Revalidation of more than 700 km of old 6″, 8″ and 12″ refined oil pipelines with the MAOP 63 bar in Czech Republic
Upgrading of 35 km of existing 16″ natural gas pipeline from 25 bar to 55 bar for PGNIG Poland
Upgrading of 55 km of existing strategic 16″ natural gas pipeline from 55 bar to 73 bar for Gaz-System, Poland
Revalidation of 8 km section of 28″ high-pressure pipeline in Latvia after a long period of shut down

Interested to find solution that fits your needs?
Contact us on +420 241 021 519, or let us know at info@ceps-as.cz


related services

The following services and products are usually provided together with this service

  • All services

Pigging services – mechanical and chemical cleaning

Hydrostatic testing

Pipeline drying

Defect assessment and reinforcing sleeves

Testing of pipes and pipeline components

services


related case studies

See related CEPS case studies

  • All case studies

New approach to the results of internal inspection

Džūkste–Peteri, Latvia
2013

Comprehensive integrity verification of high-pressure DN 400 pipeline

Dziwisov–Taczalin, Poland
2010

case studies


related documents

For more documents and other information, see the section about us

  • All about CEPS

Key professional references

summary
1999–2025

ISO 9001
ISO 14001
ISO 45001
ISO 3834-2

Inspection certificate – a static and cyclic hydrostatic pressurization

about CEPS


related communications

Read articles related to this service

  • All articles

A new approach to the results of internal inspection

Pipeline Technology Journal 6 / 2015

Systematic approach streamlines natgas pipeline pressure increase

OIL&GAS Journal 11 / 2013

communications


contact

If you have any questions, do not hesitate to contact CEPS responsible persons

  • Contact us

Aleš Brynych

general manager – CEO

phone +420 241 021 547

info@ceps-as.cz

Filip Tesař

sales manager

phone +420 606 641 328

info@ceps-as.cz

CEPS a.s. Head office

phone +420 241 021 511
fax +420 241 021 512

e-mail info@ceps-as.cz

see all contacts and maps


© 2013–2025 CEPS a.s. / Technical specifications CZ / Contacts